TRAINING CENTRE
Light weight materiality to the top
Heavy weight materiality at the base
Ground Floor
First + Second Floor
Mass + Materiality
Steel Frame
The primary structure of the Training Centre is a simple steel frame. The frame is prefabricated off site, brought to site and then erected quickly with limited disturbance on site. This then becomes the skelton of the building, allowing floors, walls, stairs and lifts to be developed within the network of steel.
TRAINING CENTRE STRUCTURAL STRATEGY
1:500 Structural Strategy Exploded Axo
1:500 Structural Strategy Diagram
FOUNDATION SYSTEM
STRUCTURE + MATERIALITY
Material choices and attachment strategy
Environmental Considerations of material and structure